Data Details

Suwon-si, Gyeonggi-do_Electric Vehicle Charging Station Installation Status

It is the current electric vehicle charging station installation status in Suwon City, and includes data such as charging station name, usage time, user restrictions, charging status, charger type, location location information, etc.
The Public Data Utilization Support Center automatically converts and provides open-format file data of three or more steps open to public data portals into open APIs (RestAPI-based JSON/XML).
To use the open API, you need to sign up for a public data portal membership and apply for utilization. For inquiries about utilization, please contact the Public Data Utilization Support Center.
File data can be used by downloading without logging in.
CSV
Suwon-si, Gyeonggi-do_Electric Vehicle Charging Station Installation Status

File data information Download metadata Provides schema.org based metadata.

A file data information table with a Suwon-si, Gyeonggi-do_Electric Vehicle Charging Station Installation Status indicates information such as classification system, provider, etc.
File Name Suwon-si, Gyeonggi-do_Electric vehicle charging station installation status_20211130
Classified Transportation and logistics - Logistics, etc. Retention
Department Department NO
Retention Collected by
Update Cycle Occasional (one-time data) Next Registration Date
Media Type Text All Rows 1580
File Extension CSV Download 375
Data Limit Keyword electric car,charging station,current situation
Registered 2021-12-15 Edited 2021-12-15
Provided Download from open data Portal (the original text file registration)
Description It is the current electric vehicle charging station installation status in Suwon City, and includes data such as charging station name, usage time, user restrictions, charging status, charger type, location location information, etc.
Other
Payment free Criteria for Additional Costs Case
Scope of License The use permission range limitless
The Public Data Utilization Support Center automatically converts and provides open-format file data of three or more steps open to public data portals into open APIs (RestAPI-based JSON/XML).
To use the open API, you need to sign up for a public data portal membership and apply for utilization. For inquiries about utilization, please contact the Public Data Utilization Support Center.
File data can be used by downloading without logging in.
XML JSON
Suwon-si, Gyeonggi-do_Electric Vehicle Charging Station Installation Status

Open API Information Download metadata Provides schema.org based metadata.

Suwon-si, Gyeonggi-do_Electric Vehicle Charging Station Installation Status Information such as classification and provision of file data information system
Service Suwon-si, Gyeonggi-do_Electric vehicle charging station installation status_20211130
Classification System Transportation and logistics - Logistics, etc. Provider
Management Agency Public Data Utilization Support Center Management agency phone number 1566-0025
Basis For Retention Collection Method
Update Cycle Occasional (one-time data) Next Enrollment Date
Media Type Text Whole Row 1580
Extension XML, JSON Application For Use 2
Data Limit Keyword electric car,charging station,current situation
Enrollment 2021-12-15 Correction 2021-12-15
Form Of Provision Download from open data Portal (the original text file registration)
Explanation It is the current electric vehicle charging station installation status in Suwon City, and includes data such as charging station name, usage time, user restrictions, charging status, charger type, location location information, etc.
Other Notes
Payment free Charge Standard And Unit Case
Scope Of Use The use permission range limitless